国产精彩免费视频_色婷婷五月综合激情中文字幕_99久久免费看精品国产一区_99电击抽搐潮喷视频_成年人视频免费在线_嫩草黄页

Hello, welcome to the Jiangsu Ideal Valve Co., Ltd. official website!
TEL:+86-515-87214888      EMAIL:fnjslxfy@163.com      

How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 一 区二区三区在线视频看 国产99视频在线 | 四虎精品成人影院观看地址 | 欧美一级视频在线观看 | gogoWWW人体大胆裸体无遮挡 | av色片 | av影片免费在线观看 | 日韩毛片免费视频一级特黄 | 国产免费观看一区 | 91麻豆精品水蜜桃91久久久 | 不卡一区二区三区视频 | 一级黄色片国产 | 久草热久| 国严精品久久久久久亚洲影视 | 欧美操操操 | 四虎影视一区二区 | 99精品视频在线导航 | 国产精品18 | 国色天香2019中文字幕在线观看 | 91精品国产自产在线观看 | 九色porny丨国产首页在线 | 粉嫩av蜜臀一区二区三区 | 亚洲无吗免费视频 | 98色花堂论坛最新地址 | 欧美一区二区三区人人喊爽 | 久久精品国产99久久 | 蜜臀成人av| 久草视频在线免费 | 福利小视频在线 | 韩日一区 | 亚洲一区亚洲 | 健身瑜伽女孩2免费观看 | 永久精品网站 | 波多野结衣一区二区免费高清 | 亚洲三区精品 | 欧美日韩一区国产 | 成人午夜激情网 | 午夜免费福利 | 国内成人精品 | 国产资源在线免费观看 | 久久成人在线视频 | 九九热视频免费在线观看 |